Pop!
Moderators: BeligerAnt, petec, administrator
4 hours, one cylinder blank from 1inch bar:
Last edited by josh on Thu Oct 28, 2010 3:37 pm, edited 1 time in total.
RPD International
www.RPDintl.com
www.RPDintl.com
Just finnished the blank for the valve
Last edited by josh on Thu Oct 28, 2010 3:37 pm, edited 2 times in total.
RPD International
www.RPDintl.com
www.RPDintl.com
and all the high flow blanks now machined ready to bore out either later in the week or when i get back to school on a more powerful lathe, and also a load of flats to machine when i get back to school or some workshop time with a mill. Just got the main tanks to machine now:
Last edited by josh on Thu Oct 28, 2010 3:49 pm, edited 2 times in total.
RPD International
www.RPDintl.com
www.RPDintl.com
finnished pop for aws33, just need to solder a few connections, add something thin at the front and rebolt a couple panels on:
RPD International
www.RPDintl.com
www.RPDintl.com
- TheAntTrap
- Posts: 59
- Joined: Fri Aug 27, 2010 9:56 am
- Location: Geneva, Switzerland and Sweden
cheers, and the valve at its widest point is 15mm dia but it will be milled down to flats so i can screw my pipes into it, the ports through it are m8 thread 5.5mm flow
RPD International
www.RPDintl.com
www.RPDintl.com
-
- Posts: 3716
- Joined: Sun Apr 03, 2005 5:30 pm
- Location: Antrim, Northern Ireland
- Contact:
130 atm all in so couple of lead weights between the two drive motors im thinking just to make up the last 20 grams
RPD International
www.RPDintl.com
www.RPDintl.com
tank blank( ) done, deciding whether i can fit a secondary reservoir in the size and space... current one is 29mm dia at the raised section (to be milled down as 4 flats)
Last edited by josh on Thu Oct 28, 2010 3:36 pm, edited 1 time in total.
RPD International
www.RPDintl.com
www.RPDintl.com